December, 2023 | Going Vertical

Progress became much more visible in December with the installation of masonry elevator and stair shafts on the project site. These shafts give a sense of the overall height of the three-story building. As each course of masonry is installed, so are steel embed plates which will eventually connect to building structure, stairs and elevator support rails. Productivity onsite was helped along by great weather and the solid gravel base that is now installed in the building footprint. We also hope everyone has seen the Christmas decorations our team installed on the construction fence.  We hope they bring a little bit more cheer to the holiday shoppers downtown!